Reading the table
- Low is a straightforward property in a market with good records and competitive local consultants. High is a complex or remote property, agency-specific scope, or difficult access. Median is the planning figure the estimator uses.
- Rush terms depend on records availability (city directories, agency files) and field scheduling; complex sites are quoted case by case.
- Bundles of Phase I, PCA, ALTA and zoning on one acquisition commonly total $5,500 to $25,000+, and a single coordinated order usually costs less than four separate ones.
Main cost drivers
| Driver | Effect |
|---|---|
| Prior industrial or fuel use | Moves a Phase I from the simple to the high-risk tier and often adds agency file reviews. |
| Building area and count | Sets PCA field days and the number of systems to review. |
| Lender program | Agency and HUD scopes add BERs, longer reserve tables and specific report formats. |
| Records availability | Missing directories or slow agency file responses extend turnaround. |
| Rush delivery | Usually 25%–50% on top, depending on the report. |
Use and citation
The dataset is free to use with attribution to Knox Cox Engineering & Due Diligence (knoxcox.com) under CC BY 4.0. How the ranges were built is set out on the methodology page.