Fee benchmarks
The 2026 ranges are compiled from 2025–2026 market observations: fee ranges published by environmental and engineering consultants, lender and SBA program materials, and fees quoted in the market for commercial engagements. For each deliverable the low and high bound the bulk of observed commercial engagements; the median is the planning point used by the calculators. Ranges are reviewed when a governing standard or a major lender program changes.
Estimator formulas
| Element | Rule |
|---|---|
| Phase I | Asset tier range (simple $2,200–$3,000; warehouse $2,600–$4,000; multifamily and hospitality $3,000–$5,000; high-risk and heavy manufacturing $5,000–$10,000) × size factor (1.00, 1.15, 1.35, 1.60). |
| RSRA | $400 / $650 / $900, offered only for SBA loans on non-Appendix 6 asset classes. |
| PCA | Size band: $2,000–$4,500; $4,500–$8,500; $7,500–$14,000; $8,500–$20,000. HUD MAP PCNA × 1.25. Not offered for vacant land. |
| ALTA survey | Size band: $2,000–$5,000; $3,500–$8,000; $5,000–$12,000; $7,000–$15,000. |
| Zoning report | $1,500 / $2,400 / $3,500. |
| Seismic | $2,500 / $4,000 / $6,500. |
| Reliance letter | $250 / $400 / $600. |
| BER screening | $800 / $1,500 / $2,500 × size factor (1.0, 1.3, 1.6, 2.0). |
| Rush | Low × 1.30, median × 1.35, high × 1.40. |
| Portfolio | 3–5 sites 5% off, 6–10 sites 10%, 11–25 sites 15%. |
| Critical path | Longest selected turnaround (high end) + reliance (5 days, 2 rush) + 5 business days lender review. |
SBA checker logic
Applies SOP 50 10 8 in order: dry-cleaner solvent use (Phase I + II), fuel dispensing or NAICS 447 (Phase I + UST testing), any other Appendix 6 code with carve-outs (Phase I, or Transaction Screen for car-wash-only), then EQ (≤ $250,000) or EQ + RSRA (> $250,000), with the pre-1978 child-occupied overlay added on top.
180-day calculator logic
Takes the earliest of the five component dates as day 0 and counts calendar days to closing: 0–180 presumed viable; 181–365 update required; 366+ new report. Update cost planning figure: $1,200–$2,000.
Standards and regulations cited
- EPA, Standards and Practices for All Appropriate Inquiries, 40 CFR Part 312 (amended to reference ASTM E1527-21, effective February 13, 2023).
- ASTM E1527-21, Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process.
- ASTM E2018-24, Standard Guide for Property Condition Assessments: Baseline Property Condition Assessment Process.
- ASTM E1903, Standard Practice for Environmental Site Assessments: Phase II Environmental Site Assessment Process.
- ASTM E2026, Standard Guide for Seismic Risk Assessment of Buildings; ASTM E2557, Standard Practice for Probable Maximum Loss (PML) Evaluations for Earthquake Due-Diligence Assessments.
- U.S. Small Business Administration, SOP 50 10 8, Lender and Development Company Loan Programs, environmental policies and Appendix 6.
- CERCLA, 42 U.S.C. § 9601 et seq., landowner liability protections and continuing obligations.
- ALTA/NSPS Minimum Standard Detail Requirements for Land Title Surveys.
- Fannie Mae Multifamily Selling and Servicing Guide; Freddie Mac Multifamily Seller/Servicer Guide.
- HUD Multifamily Accelerated Processing (MAP) Guide.
Photography
Photographs from Pexels: Lana (office facade), Kagan Bastimar (warehouse door), Дмитрий Рощупкин (roof assessors), IslandHopper X (soil auger), Nelson Axigoth (surveyor), Magda Ehlers (office tower at night), Jan van der Wolf (industrial siding).
Limits
Calculators and benchmarks are planning tools. They are not an engineering opinion, legal advice or a binding proposal. The fee for a specific property is set after the parcel's history, access and the lender's scope are reviewed.