Two compliance checks a commercial closing depends on: the environmental investigation SBA requires for your collateral, and whether a Phase I ESA is still viable on your closing date.
SOP 50 10 8Appendix 6 · 29 NAICSASTM E1527-21
Knox Cox Engineering & Due Diligence · knoxcox.com · advisory@knoxcox.com
Planning guidance from SBA SOP 50 10 8 and Appendix 6. The lender and its environmental reviewer make the final call; confirm against the SOP version in force on your approval date.
Knox Cox Engineering & Due Diligence · knoxcox.com · advisory@knoxcox.com
Calendar days, per ASTM E1527-21 and 40 CFR 312.20. See the 180-day guide.
How the SBA check decides
A dry cleaner with on-site solvent use (code 81232 with the solvent box, or the solvent box alone) needs a Phase I and a Phase II.
Fuel dispensing or code 447 needs a Phase I plus UST compliance records and tank and line testing.
Any other Appendix 6 code in the current or prior use needs a Phase I, unless its carve-out applies (assembly or sewing only); car-wash-only auto sites may start at a Transaction Screen.
No Appendix 6 match: an Environmental Questionnaire, plus an RSRA for loans above $250,000.
Pre-1978 child-occupied facilities add lead-based paint and drinking water testing on top of the level above.