ALTA/NSPS land title survey
The ALTA/NSPS survey is the boundary, improvement and encumbrance survey that title insurers need to remove the standard survey exception. It follows the ALTA/NSPS Minimum Standard Detail Requirements, with optional Table A items selected by the lender and title company.
| Table A item | What it adds |
|---|---|
| Item 1 — Monuments | Monuments placed or found at all major corners. |
| Item 3 — Flood zone | FEMA flood zone designation from the current FIRM panel. |
| Item 4 — Gross land area | Area of the parcel in square feet and acres. |
| Item 6(a)/(b) — Zoning | Zoning classification and setback, height and floor-area requirements from a zoning report or letter. |
| Item 7 — Buildings | Exterior dimensions, square footage and height of buildings. |
| Item 8 — Substantial features | Parking areas, fences, refuse areas and other visible improvements. |
| Item 9 — Parking | Striped parking spaces by type. |
| Item 11 — Utilities | Location of utilities from observed evidence and plans or markings. |
| Item 16 / 17 — Activity | Evidence of recent earth moving or construction; changes in street right-of-way. |
Fees: $2,000 – $5,000 for a small single parcel; $5,000 – $12,000+ for multi-parcel sites or heavy Table A selections. Timeline: 2 – 4 weeks, with rush surcharges for less.
Zoning compliance report (PZR)
A standalone zoning report confirms the property's zoning district, whether the current use is permitted, conditionally permitted or legal non-conforming, and whether parking, setbacks, height and density comply. It pulls open code violations, certificates of occupancy and the rebuild-after-casualty rule, which is what a lender needs when a building is non-conforming. It also supplies Table A Item 6 for the ALTA survey.
Fees: $1,500 – $3,500. Timeline: 5 – 10 business days, 3 – 5 rush; municipal response times set the pace.
Seismic risk assessment (SEL-475)
In elevated seismic hazard regions, generally where the 475-year peak ground acceleration is 0.15g or higher, lenders require a seismic risk assessment to ASTM E2026 (the guide) and ASTM E2557 (the practice). The output is the Scenario Expected Loss for the 475-year event (SEL-475), which replaced the older Probable Maximum Loss (PML) language.
| SEL-475 result | Typical lender response (Fannie Mae / Freddie Mac) |
|---|---|
| 20% or less | Acceptable; no further requirement. |
| Above 20% | Seismic retrofit to bring the SEL to 20% or less, or earthquake insurance (Fannie Mae Forms 4093 / 4099). |
Fees: $2,500 – $6,500. Timeline: 10 – 15 business days, 5 – 7 rush. Drawings speed the review and narrow the uncertainty band.
