Nationwide U.S. · Mon–Fri 8:00 AM – 6:00 PM ETproposals@knoxcox.comRequest a Proposal

Standards · ASTM E1527-21

ASTM E1527-21 Shelf Life & Updates

A Phase I ESA does not last 180 days from its cover date. The clock starts at the earliest of five time-sensitive components, and missing that is one of the most common reasons a closing file comes back.

180 days5 componentsDay 181 – 365 updateDay 366 new report

The clock starts at the earliest component

Under ASTM E1527-21 and the EPA AAI rule, a Phase I is presumed viable if five components were completed within 180 days before the acquisition date (or the date of the intended transaction). The 180 days run from the date the first of those components was completed, not from the date printed on the report.

A report signed on March 1 whose database search ran on January 10 started its clock on January 10.

The five time-sensitive components

  1. Interviews with past and present owners, operators and occupants.
  2. Searches for recorded environmental cleanup liens and Activity and Use Limitations.
  3. Reviews of federal, tribal, state and local government records.
  4. Visual inspections of the subject property and adjoining properties.
  5. The Environmental Professional's declaration and signature.

E1527-21 asks the report to list the date of each component so the viability date can be read straight from it.

Three windows

Days from earliest componentStatusWhat to do
0 – 180Presumed viableClose on the report as written (with reliance if a new lender is involved).
181 – 365Update requiredUpdate all five components; the EP issues an update that resets the 180-day window.
366 and laterExpiredCommission a new Phase I. Historical research from the old report can be reused where still valid.
Enter your component dates and closing date in the 180-day viability calculator: it takes the earliest date automatically and shows day 180, day 365 and the status on your closing date.

What an update costs

An update repeats the five components but reuses the historical research, so it usually costs less than a new report: as a planning figure, about $1,200 – $2,000 for a standard commercial property against $2,200 – $3,000 for a new Phase I, with 5 – 10 business days' turnaround. If the original consultant is not available, a new firm usually has to write a new report.

After closing: continuing obligations

The CERCLA landowner liability protections are not secured by the Phase I alone. The owner must also:

  • Comply with land use restrictions and Activity and Use Limitations, and not impede institutional controls.
  • Take reasonable steps to stop continuing releases, prevent threatened future releases and prevent or limit exposure.
  • Cooperate with, assist and give access to those performing response actions.
  • Comply with CERCLA information requests and administrative subpoenas.
  • Provide legally required notices about hazardous substances found at the property.

Closing on a deadline?

Send the property and the closing date. The proposal lists each report, its fee, the field date and the delivery date your lender needs.