What ASTM E2018-24 changed
ASTM E2018-24 replaced E2018-15 as the baseline Property Condition Assessment standard. Three changes matter in practice:
- "Observe" is multi-sensory. The field observer reports what is seen, heard and smelled: running water in a wall, a burner that sounds wrong, a musty odour, combustion smells.
- Primary improvements vs. ancillary structures. The main buildings get the full review; minor outbuildings and sheds are identified as ancillary and treated at a lighter level, so the report spends its effort where the value is.
- Immediate Costs are defined more strictly. They are reserved for life-safety hazards, conditions that will cause imminent system failure, and material code violations, rather than a catch-all for deferred maintenance.
Systems reviewed
| System | What the assessor looks at |
|---|---|
| Site | Paving, drainage, curbs, walkways, landscaping, site lighting, retaining walls. |
| Structural frame | Foundations, framing, visible distress, settlement and cracking. |
| Building envelope | Roof covering and drainage, facade, sealants, windows and doors. |
| Mechanical, electrical, plumbing | HVAC equipment age and condition, electrical service and distribution, domestic water and sanitary systems. |
| Life safety | Fire alarm, sprinklers, egress, emergency lighting; open fire and building code violations on record. |
| Vertical transportation | Elevators and escalators: age, inspection certificates, modernisation history. |
| Accessibility | Tier-1 visual ADA survey of the readily accessible public areas. |
Immediate Costs and escrow
Lenders usually escrow 100% to 150% of the Immediate Costs at closing, and size annual replacement reserves from the report's capital reserve table. A PCA that inflates Immediate Costs ties up borrower cash; one that misses a failing roof leaves the lender exposed. The estimate lines need to be specific enough to hold up when the borrower's contractor bids them.
Reserve horizon by program
| Program | Reserve table term | Notes |
|---|---|---|
| Fannie Mae / Freddie Mac multifamily | 10 – 15 years (typically 12) | Agency PCA form; BER overlays in the paired Phase I. |
| CMBS and debt funds | 10 – 15 years | Loan term plus a tail, set by the lender. |
| HUD MAP 221(d)(4) / 223(f) | 20 years (PCNA) | Project Capital Needs Assessment per the HUD MAP Guide. |
| Conventional bank / cash buyer | Usually 10 – 12 years | Scope agreed with the buyer or bank. |
2026 fees by building size
| Building | Fee range | Standard | Rush |
|---|---|---|---|
| Under 10,000 sq ft | $2,000 – $4,500 | 10 – 15 business days | 5 – 7 business days |
| 10,000 – 50,000 sq ft | $4,500 – $8,500 | 10 – 15 business days | 5 – 7 business days |
| Large multifamily, high-rise, portfolio | $8,500 – $20,000+ | 15 – 20 business days | Case by case |
What we need to quote
Address, building area and count, year built, use, unit count for multifamily, the lender and program (Agency, CMBS, HUD MAP, bank), and any existing drawings or prior reports.