Engineering · PCA

Property Condition Assessments

Building condition, Immediate Costs and a capital reserve schedule your lender can underwrite, prepared to ASTM E2018-24 by licensed engineers and building professionals.

ASTM E2018-24Immediate CostsReplacement reserves$2,000 – $20,000+

What ASTM E2018-24 changed

ASTM E2018-24 replaced E2018-15 as the baseline Property Condition Assessment standard. Three changes matter in practice:

  • "Observe" is multi-sensory. The field observer reports what is seen, heard and smelled: running water in a wall, a burner that sounds wrong, a musty odour, combustion smells.
  • Primary improvements vs. ancillary structures. The main buildings get the full review; minor outbuildings and sheds are identified as ancillary and treated at a lighter level, so the report spends its effort where the value is.
  • Immediate Costs are defined more strictly. They are reserved for life-safety hazards, conditions that will cause imminent system failure, and material code violations, rather than a catch-all for deferred maintenance.

Systems reviewed

SystemWhat the assessor looks at
SitePaving, drainage, curbs, walkways, landscaping, site lighting, retaining walls.
Structural frameFoundations, framing, visible distress, settlement and cracking.
Building envelopeRoof covering and drainage, facade, sealants, windows and doors.
Mechanical, electrical, plumbingHVAC equipment age and condition, electrical service and distribution, domestic water and sanitary systems.
Life safetyFire alarm, sprinklers, egress, emergency lighting; open fire and building code violations on record.
Vertical transportationElevators and escalators: age, inspection certificates, modernisation history.
AccessibilityTier-1 visual ADA survey of the readily accessible public areas.

Immediate Costs and escrow

Lenders usually escrow 100% to 150% of the Immediate Costs at closing, and size annual replacement reserves from the report's capital reserve table. A PCA that inflates Immediate Costs ties up borrower cash; one that misses a failing roof leaves the lender exposed. The estimate lines need to be specific enough to hold up when the borrower's contractor bids them.

Reserve horizon by program

ProgramReserve table termNotes
Fannie Mae / Freddie Mac multifamily10 – 15 years (typically 12)Agency PCA form; BER overlays in the paired Phase I.
CMBS and debt funds10 – 15 yearsLoan term plus a tail, set by the lender.
HUD MAP 221(d)(4) / 223(f)20 years (PCNA)Project Capital Needs Assessment per the HUD MAP Guide.
Conventional bank / cash buyerUsually 10 – 12 yearsScope agreed with the buyer or bank.

2026 fees by building size

Fees rise with building count, MEP complexity and access needs (roof, units, elevator rooms).
BuildingFee rangeStandardRush
Under 10,000 sq ft$2,000 – $4,50010 – 15 business days5 – 7 business days
10,000 – 50,000 sq ft$4,500 – $8,50010 – 15 business days5 – 7 business days
Large multifamily, high-rise, portfolio$8,500 – $20,000+15 – 20 business daysCase by case

What we need to quote

Address, building area and count, year built, use, unit count for multifamily, the lender and program (Agency, CMBS, HUD MAP, bank), and any existing drawings or prior reports.

Closing on a deadline?

Send the property and the closing date. The proposal lists each report, its fee, the field date and the delivery date your lender needs.