Nationwide U.S. · Mon–Fri 8:00 AM – 6:00 PM ETproposals@knoxcox.comRequest a Proposal

Calculator

SBA SOP 50 10 8 & 180-Day Viability Checker

Two compliance checks a commercial closing depends on: the environmental investigation SBA requires for your collateral, and whether a Phase I ESA is still viable on your closing date.

SOP 50 10 8Appendix 6 · 29 NAICSASTM E1527-21

Collateral and uses

Use the most sensitive prior use known from records, aerials or interviews.

Search Appendix 6

Click a code to set it as the current use; Shift+click sets the prior use.

Site conditions

SBA SOP 50 10 8 Compliance Memo

Required investigation

—

Why

    Estimated fee and turnaround

      File and guaranty

        Request a proposal with these findings

        Planning guidance from SBA SOP 50 10 8 and Appendix 6. The lender and its environmental reviewer make the final call; confirm against the SOP version in force on your approval date.

        How the SBA check decides

        1. A dry cleaner with on-site solvent use (code 81232 with the solvent box, or the solvent box alone) needs a Phase I and a Phase II.
        2. Fuel dispensing or code 447 needs a Phase I plus UST compliance records and tank and line testing.
        3. Any other Appendix 6 code in the current or prior use needs a Phase I, unless its carve-out applies (assembly or sewing only); car-wash-only auto sites may start at a Transaction Screen.
        4. No Appendix 6 match: an Environmental Questionnaire, plus an RSRA for loans above $250,000.
        5. Pre-1978 child-occupied facilities add lead-based paint and drinking water testing on top of the level above.

        The full code table with every carve-out is on the SBA SOP 50 10 8 page.

        Closing on a deadline?

        Send the property and the closing date. The proposal lists each report, its fee, the field date and the delivery date your lender needs.